Carbon & Petroleum TradingMina Miura investment project

Mina Miura · Seam 3 · Ibias, Asturias, Spain

Restarting anthracite production at Mina Miura

The workings already reach the seam, reserves are estimated at about 1 Mt, and the coal quality has been confirmed by the independent Intertek laboratory. We are raising €3.74M for two directions: anthracite mining and beneficiation of coal from waste heaps.

See the project economics

Underground workings at Mina Miura

estimated reserves, seam 3
~1 Mt
project data
planned output from 2028
60,000 t/yr
CPT model
gross calorific value
6,882 kcal/kg
Intertek, LA-2587
annual cash flow from 2029
€5.98M
CPT model, pre-tax
investment request
€3.74M
two directions

Project

A ready asset, being restarted

Mina Miura is an underground anthracite mine in the municipality of Ibias, in the historic coal district of western Asturias. The previous owners stopped operations because of economic miscalculations. The company is now being restarted with a new management team and an updated financial model.

Archive photograph from the project business plan
Archive photograph from the project business plan
Adit portal and mined anthracite
01

Access to the seam is done

The workings reach coal seam 3. Production can start as soon as the financing is in place.

CAT 324D excavator at the face
02

Equipment on site

The adit portal is prepared and mining equipment is on site. The investment restarts operations rather than building from scratch.

Coal seam 3
03

Processes in place

The chain from extraction to sales has been worked out and, in our assessment, needs no further exploration.

Investment

Two directions, one request: €3.74M

Invest in one direction or both. Each has its own financial model and participation scheme.

Direction 1 · Mine

Anthracite mining at Mina Miura

Ibias, Asturias

€2,500,000

68% · launch per model32% · financing reserve

  • 5,000 t a month from January 2028
  • 38,500 t in 2027 and 60,000 t a year after that
  • Cumulative cash flow positive from January 2028
  • The existing €1.5M debt is already in the model and not added to the request

Form of participation and terms agreed with each investor

Mining economics →

Direction 2 · Beneficiation

Beneficiation of coal from waste heaps

Guardo, Palencia

€1,240,000

Use of €1,240,000

  • Over 6 Mt of anthracite heaps within 20 km
  • 45,000 t of concentrate a year
  • Model EBITDA of €1.75M a year, ≈36% margin
  • Business project approved by the authorities, permits in place

50% of profit until capital is returned → up to 3 years → 35% stake in CPT

More on beneficiation →

Direction 1 · Economics

Anthracite mining economics

CPT model: production schedule and costs from the business plan, current prices, sales collected the following month. All figures are before taxes and interest on new financing.

Production ramp-up

Saleable output, t per month

38,500 t — 2027·60,000 t/yr — from 2028

Products and prices

Share of output and CPT model price

€158/t weighted average price

Structure of the €2.5M request

The €1.5M debt is in the model: €300k in January 2027, then €150k a month from February to September. It is not added to the request again.

Peak funding need — May 2027

Cash flows per model

€M

  • Receipts
  • Costs and investment

Sales are collected the following month. The balance includes investment payments and the existing debt.

First-year costs

2027, €

Annual payments; part is covered by sales receipts.

Price scenario: test the safety margin

Only the average selling price changes — the production schedule and costs stay as in the CPT model.

€158/t
  • The request covers the peak down to €98.3/t
  • Break-even from 2029 at €58.3/t
Peak funding need€1.65MMay 2027
€2.5M request✓covers the peak with €0.85M to spare
2028 balance+€5.13MCumulative cash positive from January 2028
Each year from 2029+€5.98M
Cumulative 2027–2040+€76.8M

Cumulative cash flow, €M

Before taxes and interest on new financing. An illustration of the model, not a guarantee.

From the site

The project at work

Underground transfer point
Conveyor loading coal
Coal stockyard
Screening plant

Direction 2

Beneficiation of coal from waste heaps

We are restoring the beneficiation plant in Guardo (Palencia) to turn anthracite once dumped on heaps into concentrate for industrial buyers. The business project is approved by the authorities and all required permits are in place.

Investor participation scheme

  1. Stage 150% of distributed profituntil the invested capital is fully returned
  2. Stage 2Up to 3 yearsif the capital comes back sooner, the next stage starts sooner
  3. Stage 335% stake in CPTafter the capital is fully returned; up to 40% if the investor funds the whole project

Indicative capital return

≈ 17–23 months

17 months with 50% of model EBITDA (€1.75M a year) distributed; 23 months if 25% corporate income tax is also deducted. An illustration, not a promise of returns.

Use of €1,240,000

Financials, per year

Revenue
€4,837,500
Operating costs
€3,084,880
EBITDA
€1,752,620
EBITDA margin
36.2%
Capital expenditure
€1,240,000
Payback on EBITDA
≈ 8.5 months
Average selling price
€107.5/t

Process

  1. 1Heapsloading raw material
  2. 2Screeningpre-screening at the heaps
  3. 3Haulageto the yard, under 10 km
  4. 4Washingbeneficiation and sizing
  5. 5Productanthracite concentrate

Raw-material base

Estimated heap resources within 20 km, t

Production

Raw material processed
370,000 t/yr
Finished concentrate
45,000 t/yr
Operating schedule
25 working days a month, two 8-hour shifts

Anthracite concentrate

Ash
14–18%
Volatile matter
5–8%
Sulphur
≤ 0.7%
Moisture
≤ 10%
Fraction 0–10 mm
80–85%
Fraction +10 mm
15–20%

Market. Strong demand for anthracite concentrate in Spain. The main buyers are producers of electrodes and specialty carbon products.

Quality

Quality confirmed by an independent laboratory

A coal sample from seam 3 was analysed by Intertek Iberica Spain, ENAC accreditation No. 40/LE2322. Report LA-2587, 7 February 2024.

  • 3.1% volatile matter and ≈80% fixed carbon are hallmarks of anthracite.
  • Gross calorific value of 6,882 kcal/kg, or 7,244 kcal/kg on a dry basis.
  • 0.72% sulphur and 12.2% ash, as received.

Anthracite is used in metallurgy, electrode and carbon-material production, water filtration and as a high-calorific fuel.

Download the Intertek certificate PDF · 272 KB · 2 pages
Intertek · LA-2587ENAC № 40/LE2322
Intertek LA-2587 · Quality confirmed by an independent laboratory
ParameterAs receivedDry basis
Total moisture5.0%—
Ash12.23%12.87%
Volatile matter3.1%3.3%
Fixed carbon79.72%83.79%
Sulphur0.72%0.76%
Gross calorific value6,882 kcal/kg7,244 kcal/kg
Net calorific value6,744 kcal/kg7,150 kcal/kg
Carbon76.5%80.5%
Hardgrove grindability index (HGI)—38

Location

Where the project is

The mine is in western Asturias, the beneficiation plant in the Palencia coal basin. Both areas have a long history of anthracite mining.

Vilares (Tormaleo), 33810 Ibias, Asturias

42°55′30″ N · 6°46′59″ W

Western Asturias — a historic anthracite district on the border with the province of León.

Open in Google Maps ↗

Structure

Who is involved

The companies and organisations whose documents underpin the investment materials.

  • Carbon & Petroleum Trading LTDProject initiator: financial model and fundraising
  • carbones LA VEGA SLUDevelopment business plan for Mina Miura, seam 3 (March 2025)
  • Combustibles Asturiana y Leonesa SLCommissioned the coal analysis; company address at Mina Miura, Vilares, Ibias
  • Intertek Iberica Spain S.L.U.Independent laboratory, ENAC accreditation No. 40/LE2322

Team

Team and contacts

The people running the project and answering investors. Write to them directly or use the form.

Name Surname

Project director

Carbon & Petroleum Trading

Name Surname

Technical director, mining engineer

Mina Miura

Name Surname

Chief financial officer

Carbon & Petroleum Trading

Name Surname

Legal counsel (Spain)

Documents

Project documents

The coal analysis certificate is available now. The business plan, financial model and permits are shared on request after an NDA.

  • Intertek coal analysis certificate LA-2587PDF · 272 KB · 7 Feb 2024Download
  • Investment memorandumPDF · on request
  • Development business plan, Mina Miura seam 3PDF · March 2025 · on request
  • CPT financial modelXLSX · 2026 · after NDA
  • Beneficiation plant business project and permitsPDF · after NDA

Timeline

From coal analysis to full capacity

  1. February 2024Seam 3 coal analysed by Intertek (ENAC-accredited)Done
  2. March 2025Mina Miura development business planDone
  3. 2026CPT financial model and €3.74M investment requestDone
  4. January 2027Production starts per model — 1,750 t/monthPlan
  5. May 2027Peak funding needPlan
  6. July 20274,000 t/monthPlan
  7. January 2028Design capacity of 5,000 t/month; cumulative cash turns positivePlan
  8. 2029–2040Steady output of 60,000 t/yrPlan

Questions

Frequently asked questions

Didn't find your answer? Ask the AI assistant or the team.

How much investment is required?

The total request is €3.74M across two directions: €2.5M for anthracite mining at Mina Miura and €1.24M for beneficiation of coal from waste heaps. You can invest in one direction or both.

When does the project turn cash-positive?

In the CPT model the mine's cumulative cash flow turns positive in January 2028. The 2028 balance is about €5.13M, and from 2029 about €5.98M a year. All figures are before taxes and interest on new financing.

What is the coal quality?

A seam 3 sample was analysed by Intertek (ENAC-accredited), report LA-2587: volatile matter 3.1%, fixed carbon 79.7%, ash 12.2%, sulphur 0.72%, gross calorific value 6,882 kcal/kg. These are typical anthracite figures; the certificate can be downloaded under Documents.

What are the investor terms?

For heap beneficiation: 50% of distributed profit until the capital is fully returned (up to 3 years), then a 35% stake in CPT. For anthracite mining, the form of participation and terms are agreed individually — leave a request and the team will propose options.

Why was the mine idle?

The previous owners stopped operations because of economic miscalculations. The workings to the seam are complete and the chain from extraction to sales has been worked out. The company is now restarting with a new management team and an updated financial model.

What if anthracite prices are lower?

At the 2025 business-plan prices (€130/t on average instead of €158/t) the peak funding need is about €1.91M, which the €2.5M request covers. The request covers the peak down to an average price of about €98/t, and steady-state cash costs are about €58 per tonne.

What are the reserves and mine life?

Reserves in the accessible seam are estimated at about 1 Mt (project data). At the planned 60,000 t/yr that covers the business plan horizon of 14 years (2027–2040). Supporting materials are provided during due diligence.

Are taxes included?

No. The models show cash flows before taxes and interest on new financing. The tax structure is discussed when the deal is prepared; we recommend involving your own advisers.

Which documents can I get?

The Intertek coal analysis certificate can be downloaded right away. The business plan, financial model, investment memorandum and the beneficiation permits are shared on request after an NDA.

Contact

Let's talk about participation

Leave your details — we'll send the investment memorandum, answer your questions and set up a call with the team.

Direct contact

Name Surname

Investor relations

invest@example.com+34 600 000 000